Valparaiso Community Schools

Funding structure, how it compares to peers, and where major projects stand.

How is Valparaiso Community Schools paid for, and who decides?

State money per student, local property taxes and two voter-approved referendums

Most of the district's money comes from Indiana's per-student funding, about $7,400 to $7,700 per student. Local property taxes pay for buildings, buses and debt. Voters also approved an operating referendum, which pays for class sizes and staff retention, and a capital referendum. The district is run by a five-member Board of School Trustees appointed by the Valparaiso City Council, not elected. The city council must also approve the district's budget each year.

Appointed board

Trustees are appointed by the city council. Erica Watkins is president and Ashley Cruz is vice president, re-chosen in January and July 2026.

New superintendent

Dr. Brian J. Smith became superintendent in July 2026. He replaced Dr. Jim McCall, who led the district from 2020 to June 2026.

2027 budget

The proposed 2027 budget for tax-supported funds is $106,125,723, up about 1.6% from 2026. The advertised tax rate is $0.9920. The city council approved the budget in October 2026.

Operating referendum

Voters renewed the operating referendum in May 2022 for eight years, so it runs out around 2030. It also pays a 1% yearly retention stipend to staff.

These facts come from what was said in meetings, not from audited financial statements. The district's own budget documents are on websites we cannot reach.

Where the district stands

Fall 2026 enrollment (state count)verified
6,239.28 students

Down about 40-45 students from the year before.

Proposed 2027 budget, tax-supported fundsverified
106,125,723 dollars

Up about 1.6% from 2026.

Advertised 2027 tax rateverified
0.992 dollars per $100 assessed value

The state usually certifies a lower final rate.

Starting teacher salary, 2026-27verified
56,200 dollars

Up from $55,300.

State funding per student (approx.)context
7,700 dollars per student

Rounded figure the superintendent gave on October 15, 2026. It is context, not an exact amount.

Major projects

Energy savings project, Phase 2

Under construction; microturbines waiting on the NIPSCO utility connection

Adds solar panels at many buildings, small on-site generators (microturbines) and new building controls. Phase 1 saved $495,000 in its first year, more than the $436,000 guaranteed.

Next: Microturbines expected to come online after the NIPSCO connection, which was expected October-December 2026.
  1. Board updated on Phase 1 results and Phase 2 scope.
  2. First-year Phase 1 savings reported at 114% of the guarantee.

Funding

Guaranteed energy-savings contract, paid back from guaranteed savings of about $34 million over its life

Amounts as stated in the December 18, 2025 recording.

2026 bond projects: middle school finishes, boilers and paving

Contracts awarded; work underway

Bonds sold in April 2026 raised about $7.4 million at a 3.04% interest rate. They pay for new cafeteria, auditorium and wall finishes at Benjamin Franklin and Thomas Jefferson middle schools ($980,900), an instrument refresh and HVAC. Separately, a high school boiler ($667,000) and asphalt work ($450,460) were awarded in March.

Next: The Thomas Jefferson auditorium work was set to follow the winter concerts.
  1. Boiler and asphalt contracts awarded.
  2. Bond sale reported (AA- rating, 3.04%).
  3. Middle school finish contracts awarded ($980,900).

Funding

2026 general obligation bonds

Net bond proceeds as stated in the April 16, 2026 recording.

Alternative school renovation and addition

Phase 1 complete; later phases under construction

The district's alternative and career school is being renovated and expanded with spaces for culinary, graphic arts, vet tech and staff training. A new maintenance and IT building is also being built.

Next: A wrap-up construction update was expected in November 2026.
  1. Construction progress reported.
  2. Phase 1 reported complete.
  3. Maintenance/IT building timeline extended through late 2026.

Funding

District construction bonds

No total cost was stated clearly in the recordings.

Recent news

We reviewed 16 recordings of Board of School Trustees meetings from November 2025 to October 2026, using the auto-generated captions on the district's YouTube channel. Captions often garble names and numbers, so this page uses only figures that are clear in context.