Mamaroneck Union Free School District

How the Mamaroneck schools are funded, governed and what is being built.

How are the Mamaroneck schools paid for?

Mostly local property taxes, voted on every May

The 2026-27 budget is $176,560,406. About $153.1 million of it (87%) comes from the local property tax levy. The rest, about $23.4 million, comes from state aid and other revenue. Voters in the district approve the budget each May, and the levy is limited by a New York state tax cap. The district says the 2026-27 levy increase of 3.07% is under that cap.

Voters decide the budget

On May 19, 2026 voters passed the budget 859 to 167. The next vote is the annual meeting on May 18, 2027, according to the board's 2026-27 calendar.

People are most of the cost

The superintendent's budget presentation says salaries and benefits are almost 80% of spending.

Building work is paid from reserves and a bond

Voters approved a bond in 2024 for repairs and upgrades, and on May 19, 2026 approved spending $9 million from a capital reserve fund set up in 2025. The district says it can set aside up to $20 million over 15 years for facilities.

Enrollment is shrinking in the elementary schools

Total enrollment is about 5,431 in 2026-27. Three of four elementary schools lost students this year, and the district expects smaller kindergarten classes because of lower birth rates in 2020 and 2021.

A growing budget is not the same as a growing school. Spending is rising 4.36% while elementary enrollment falls, and the posted records do not break out how much of the increase is special education, salaries or building costs.

Where the district stands

2026-27 school budgetverified
$176,560,406

Up 4.36% ($7,368,414) from $169,191,992 in 2025-26. Approved by voters May 19, 2026.

2026-27 property tax levyverified
$153,122,478

Up 3.07% ($4,558,301). Projected tax rate $12.4111 per $1,000, down 0.32%.

Students enrolled, 2026-27verified
5,431 students

Six schools: four K-5 elementary schools, Hommocks Middle School (1,280) and Mamaroneck High School (1,749).

Budget per student (calculated)context
$32,510

Calculated: $176,560,406 divided by 5,431 students. It includes costs such as debt, transportation and benefits, so it is not classroom spending per student.

Budget vote resultverified
859 yes, 167 no votes

Capital reserve proposition passed 898 to 119.

Major projects

2024 bond building projects

Phase 2 work through 2027

Repairs and upgrades at every school, paid for by a bond voters approved in 2024. Finished: Hommocks pool locker rooms, high school roofs and Palmer gym floor, Mamaroneck Avenue School masonry and classroom floors. Planned for 2026: Hommocks rooftop units and cafeteria, Chatsworth sky gym and fire alarm, a new kitchen at Central. Murray Avenue School kitchen, cafeteria and music suite work is planned for 2027.

Next: Murray Avenue School work is projected for 2027; a re-bid has not appeared in the posted records.
  1. LAN Architects update to the board
  2. Board rejects all Murray Avenue School bids to revise the plans
  3. Board rejects over-budget Central School bids; district will self-perform the work

Funding

2024 voter-approved bond

$9 million capital reserve projects

Voter-approved, projects to be scheduled

Auditorium, common space, restroom, kitchen, library, public address, playground, field and parking improvements, security vestibules, scoreboards, stage lighting, fire alarm panels, rooftop HVAC units and corridor tile. The board approved moving the $9,000,000 to the capital fund on June 16, 2026.

Next: Design and state approval steps for individual projects; no schedule is posted.
  1. Board classifies the work under state environmental review and sends the proposition to voters
  2. Voters approve 898 to 119
  3. Board approves the $9,000,000 transfer to the capital fund

Funding

2025 Capital Reserve Fund ($9,000,000)

Solar carports and energy upgrades

Work at Mamaroneck Avenue School stopped

An energy performance contract with Honeywell covers boilers and solar carports at several schools. New boilers are installed at the high school, Mamaroneck Avenue School and Chatsworth. The Village of Mamaroneck stopped carport work in July 2025. The village lifted the order at the high school; the dispute over Mamaroneck Avenue School led the board to authorize court action.

Next: No court ruling or restart of work appears in the posted records.
  1. Village issues stop-work order
  2. Board votes to start legal proceedings
  3. Board authorizes filing in state Supreme Court

Funding

Energy performance contract approved by voters (savings-funded)

Recent news

Figures marked verified come from the 2026-27 budget book, the official vote results and board presentations. The per-student figure is a calculation and is marked as context.