ourschoolboard.org

District overview

MSAD 53 (RSU 53)

Funding structure, how it compares to peers, and where major projects stand.

Editorial graphic for MSAD 53 (RSU 53)
Editorial caption by Our School Board; base: Carl Hårleman · public-domain

How is MSAD 53 paid for, and who decides?

A three-town district funded by state aid and town shares, building a state-paid new school

MSAD 53 runs three public schools for Burnham, Detroit and Pittsfield: Manson Park School (PreK-K), Vickery School (grades 1-4) and Warsaw Middle School (grades 5-8). High school students attend Maine Central Institute, a private academy the district contracts with. Money comes from Maine's school funding formula (EPS) plus a local share split among the three towns based on property values and students. An 11-member board (7 from Pittsfield, 2 each from Burnham and Detroit) writes the budget. Voters approve it at a district budget meeting and then in a town-by-town referendum.

Budget up 1.7% for 2026-27

Passed May 4, 2026, using $400,000 of savings and leaving 4 teaching jobs empty. Health insurance rose 10%.

Town shares differ

Because property values rose, April estimates had Pittsfield's share up 9.41%, Burnham's up 5.16% and Detroit's up 0.97%.

State aid fell

Falling three-year student counts cut state aid by about $98,000. A one-time $59,000 state check covered part of it.

New superintendent

Julie Kimball replaced Sharon Littlefield on July 1, 2026.

No budget book or audit is posted online, so these figures come from board minutes, not the full budget.

Where the district stands

PreK-8 students, winter 2026verified
554 students

The state agreed to plan the new school for 525 students, based on lower enrollment projections.

2026-27 budget increaseverified
1.7 percent

Total budget dollars are not posted online.

Savings (fund balance) used to lower 2026-27 taxesverified
400,000 USD
New school total project costverified
81,961,995 USD

$75,815,412 state-subsidized; $6,146,583 in local add-ons.

Yearly teacher base raise, 3-year contractverified
3.5 percent

Major projects

New PreK-8 school (ages 0 to grade 8)

approved by voters; in design

A 103,583-square-foot school on the Warsaw/Vickery campus will replace Manson Park, Vickery and Warsaw. Voters approved it and three local add-ons on September 15, 2026. The district plans three classes per grade.

Next: Design development, a new architect contract and bond financing; no groundbreaking date is posted (February 2026 minutes hoped for the following summer).
  1. State Board approves the site
  2. State approves space plan
  3. Concept straw poll
  4. Public hearing
  5. Referendum passes, all four articles
  6. Finance Committee reviews short-term borrowing bids

Funding

Maine Major Capital School Construction Program ($75.8M) plus local bonds for the gym, birth-to-3 rooms and upgrades ($6.1M); a $2.5M fundraising campaign

Bell-to-bell phone ban

in effect

Policy JICJ, amended August 3, 2026, bans phones, smartwatches and wireless headphones for PreK-8 students all school day, following a new state law.

Next: Rules shared through student handbooks.
  1. Superintendent reports state ban coming
  2. First read
  3. Adopted with headphones added

Funding

State allows $6 per student for phone storage, paid back later

Local elections & school board members

Elections & votes

Board electionScheduled

Pittsfield MSAD 53 board seats, November 3, 2026 town election

Pittsfield

Pittsfield's town clerk opened nomination papers on September 1, 2026 for two school board (MSAD 53 director) seats, plus two Town Council seats, with papers due September 21. The election is held with the November 3, 2026 ballot. Candidate names were not found in a public source.

Official source · verified Oct 30, 2026

BondPassed

Article 1: new state-subsidized PreK-8 school

MSAD 53 (Burnham, Detroit, Pittsfield) · $75,815,412

Approved bonds for a $75.8 million state-subsidized PreK-8 school. Passed 662-132 (Burnham 110-70, Detroit 79-19, Pittsfield 473-43).

Official source · verified Oct 30, 2026

BondPassed

Article 2: locally funded auxiliary gym

MSAD 53 (Burnham, Detroit, Pittsfield) · $3,399,730

Locally funded $3.4 million auxiliary gym. Passed 490-305; Burnham voted no 53-127.

Official source · verified Oct 30, 2026

BondPassed

Article 3: locally funded birth-to-age-3 early childhood center

MSAD 53 (Burnham, Detroit, Pittsfield) · $2,423,793

Locally funded $2.4 million early childhood rooms. Passed 453-342; Burnham voted no 50-130.

Official source · verified Oct 30, 2026

BondPassed

Article 4: locally funded building enhancements

MSAD 53 (Burnham, Detroit, Pittsfield) · $323,060

Locally funded $323,060 durability upgrades. Passed 506-288; Burnham voted no 58-122.

Official source · verified Oct 30, 2026

Public votePassed

2026-27 budget validation referendum

MSAD 53 (Burnham, Detroit, Pittsfield)

Voters in the three towns validated the 2026-27 budget adopted at the May 21 district budget meeting; the board ratified the results on June 10. Vote counts are not in the posted minutes.

Official source · verified Oct 30, 2026

School board members

Recent news

View the news feed →

Resources

Practical guides to school phone policies, district budgets, and administrator hiring.

Explore resources →

Collected from the public Google Drive folders linked on the district's Google Site (www.msad53.org): every board agenda and minutes posted from November 2025 to the November 2, 2026 agenda, a board workshop and Finance Committee agenda, the new school project folder (public hearing slides, referendum results, FAQ, plans and flyers), policies JICJ and IJNDB, the strategic plan, the 2026-27 calendar and the board meeting-date list.

Get alerts for MSAD 53 (RSU 53)

We read every agenda, packet, recording, and set of minutes, and write up the decisions that affect families — each one linked to the document it came from.

Copy the RSS link into your feed reader to get new published alerts.